Call us on: 01793 714999

Dear Valued Customer,

Ref: Price Increase 1st April 2025

As you may be aware, we have seen ongoing rising costs and continue to experience the effects of inflation. Whilst we have worked hard to mitigate these costs, by improving efficiency and offsetting rising costs in extraction and manufacturing, the cost pressure of legislation, planning and industry pressures across the supply chain means that we will continue to be directly impacted in all aspects of our business and cost base in 2025.

As a result of this ongoing cost pressure, we are writing to notify you of an increase to our range of products and services which will come into effect on 1st April 2025.

Product

Type / Description

Increase per unit

Unit

Aggregates

Washed sand and gravel

1.35

Tonne

 

Water Park 10/20 mm gravel Shorncote Quarry

1.85

Tonne

 

Asphalt sand

2.00

Tonne

 

Mortar sand

1.60

Tonne

 

Dry screened sand

1.10

Tonne

 

Clean graded limestone

1.30

Tonne

 

MOT Type 1

1.10

Tonne

 

6F5 / fill materials / crusher runs

0.80

Tonne

 

As dug gravel

0.80

Tonne

 

As dug sand / dust

0.80

Tonne

 

Path gravel

1.25

Tonne

 

Cotswold chippings

1.50

Tonne

 

 

 

 

Concrete

All concrete and screed mixes

3.85

Cubic Metre

 

Part load charge 6 mt / 8 mt

56.00

 

 

Part load charge Mini Mix

48.00

 

 

Waiting time per hour

105.00

 

 

Returned concrete

180.00

 

 

Cancellation charge

15.00

 

 

 

 

 

Topsoil

BS 3882

0.95

Tonne

 

As dug topsoil  / manufactured topsoil       

0.75

Tonne

 

Screened topsoil

0.85

Tonne

 

 

 

 

Please also note:

• At this time there is no planned change to our existing ancillary charges.
• From April 1st the HMRC Aggregates Levy will be increasing from £2.03 to £2.08 per tonne. The increases in this letter include the impact of this legislative change.

Any other product and/or service increases not covered by the above will be notified by your local Hills representative.

Please remember all orders for the sale of goods and/or services by Hills Quarry Products incorporate exclusively Hills’ standard terms of sale applicable to the relevant goods.

These increases will be applied to all existing contracts, orders and quotations for aggregates, concrete and screed effective from 1st April 2025.

May I take this opportunity to thank you for your ongoing business and trade and supporting our business through a challenging 18 months. At Hills we will continue to strive to service you to the best of our ability and continuously invest in our business to meet customer demands.

Yours faithfully

Steve Huntly
Managing Director – Hills Quarry Products

Back to eNewsletter
eNewsletter sign-up

Click here to receive the Hills Quarry Products newsletter via email. Currently issued up to 4 times a year.



Your enquiry have been deleted. Continue


Continue



View my enquiry Continue
Enquiry