Shorncote Quarry is located in the Cotswold Water Park a few miles south of Cirencester and has state-of-the-art facilities for the production of aggregates and ready-mixed concrete. The quarry produces a high quality washed sand and gravel (BS EN 12620) plus various grades of crushed rock. It also produces secondary aggregates and topsoil through resource recovery incorporated into a tipping operation for inert materials. The site also has a state of the art ready-mixed concrete plant.
Hills Quarry Products Limited, Shorncote Quarry, Shorncote, Cirencester, Gloucestershire, GL7 6DA
Tel: 01285 861167 Fax: 01285 860401
Concrete tel: 01285 860840
Monday – Friday: 07:00 – 17:00
Saturday: 07:00 – 12:00
Download site rulesContact us
Our experienced sales team are on hand to help with your enquiry
click here or call
01793 714999 (sales)
01793 693323 (mini-mix concrete)