Hills Quarry Products, working with contractor Emery, went above and beyond to deliver concrete at a luxury hotel recently using one of the UK’s largest concrete pumps.
13 cubic metres of concrete was impressively pumped over the roofs of multiple buildings and down through a narrow leaded window at the prestigious Whatley Manor Hotel and Spa in Wiltshire.
Hills Quarry Products was contracted by Emery to deliver the ready-mixed concrete to create a new floor inside a kitchen as part of the hotel’s recent major renovation work. The concrete was supplied from Hills’ Lower Compton site and one of the UK’s largest concrete pumps with a placing boom of 60 metres in length from Camfaud was used for the successful delivery up, over and through buildings to the required location.
Back to eNewsletter